Friday 11 February 2011

Analysis Of Our Footage From The Weekend

At the weekend we filmed part of our short film, however we didnt manage ro film as much as we intended to because members of our production had other important comitments. We managed to keep on schedule up untill 2pm capturing  the train station scene, beach scene and dog walking scene.The weather on sunday was great for filming and therefore our outdoor scenes were successful. We knew that we may have some difficulties filming at the train station as its a public area and our longest scene.

As we were faced with a few problems we may decide to re shoot certain parts of the train scene. The first problem we were faced with was when a member of the public ruined a clip of Lucas stepping of the train by waving at the camera; this clip was hard to capture anyway as the trains didnt come very often.Another problem we came across was that in our planning stage we had planned for the platform to be busy and therefore capture footage of Lucas weaving through people; however when we got to the platform it was much quieter therefore we were unable to capture certain shots. The last problem we were faced with was that the sound of the trains overpowered our dialogue and therefore we are going to have to record the sound and dub it over. 

No comments:

Post a Comment